Services
- Architectural Design
- Interior Design
- Property search
- Feasibility Studies
- Pre-purchase architectural advice
- 3D drawings
- Measured surveys
- Planning Permission Applications
- Permitted Development and Lawful Development Applications
- Listed Building Consent Applications
- Conservation Area Applications
- New Build House Designs
- House Refurbishment Designs
- Side Extension Designs
- Loft Extension Designs
- Garden Designer
- Kitchen Designer
- Furniture Designer
- Measured Surveys 3d and 2d
- Building Control Applications
- Principal Designer
- Conservation Area Reports
- Sustainable Design and Construction Statements
- Technical Drawings
- Tenders
- Contract Administrator
- Construction visits
- 3D drawings
- Visualisations.
- Sculptor
- Public Art
How to Get Started
The full terms of my appointment can be found within RIBA’s Standard Agreement, which will be sent as part of the formal letter of appointment prior to commencement.
I work on a fixed fee basis – rather than simply taking a percentage of your overall budget – meaning that should you decide to splash out on a very expensive kitchen, rather than a cheaper one, my fee would not increase.
Apart from that, the only time extra fees will be required is if the brief changes, or redesigns are requested once we’ve signed off a stage. But that’s something that we’d discuss before any extra work was undertaken.
STAGES OF WORK (RIBA)
Embarking on changing your home can be a daunting process. Some people say it can be the most stressful thing you ever do! I have been doing this for over 25 years now, so I will help remove as much of the stress as possible.
To help tackle this big beast we break the project up into manageable stages. I use the stages recommended by the Royal Institute of British Architects (RIBA). At the first stage we tackle the bigger picture and then as each stage progresses we increase the detail.
Here is a list and explanation of each of these stages:
RIBA STAGE 0: STRATEGIC DEFINITION
Yes, there is a stage 0! Stage 0 is about determining the best means of achieving the client’s requirements. An open mind is required because there’ll be lots of different options at this stage for how best to create your dream home.
Stage 0 should be strategic in nature, defining the Business Case and Client Requirements. Depending on the circumstances, the stage can range from being a very quick review to being a long and protracted process involving many consultants. For Stage 0 to deliver the best outcome for the client, the crucial consideration for the client is what skills need to be brought to the client team. Different projects, each with a unique site and brief, bring different challenges and so require different skills. Developing the Business Case might require strategic thinking, management consulting expertise, whole life analysis, sustainability guidance, financial modelling or design thinking. Selecting the right team to deal with the strategic considerations is crucial. Once the outputs from the stage proceed to Stage 1, a building project has been set up and different skills will be needed.
At this stage you may not have even purchased your house. I regularly help clients to find a house that will work for them, and has the potential to be turned into their dream home.I am happy to advise clients on the pros and cons of a house or a site. Here is a quote from a client, whose house I helped to find:
“Peter Morris was invaluable in helping us find the perfect property to buy. He provided practical, expert advice on every aspect of the process—from choosing the right location and assessing the property’s orientation to identifying potential construction issues and navigating planning regulations. Peter also guided us through the financial side of things, helping us understand the true costs of the proposed development. His comprehensive support made the entire experience smoother and more informed and we are really happy with the house we bought. I highly recommend Peter for anyone looking to purchase a house.”
Kate Reed, (client)
RIBA STAGE 1: PREPARATION AND BRIEFING
I will ask you to write a brief for the project’s goals. It doesn’t need to be big, it can just be one or two pages of A4. The purpose of the brief it to set out the important goals you wish to achieve. This will help me produce my designs. We can also use it as a live document to record changes in the brief. It is a useful thing to write it down because we can refer back to it as we proceed, to check everything is being achieved.
Stage 1 is about developing the detail of the brief and making sure that everything needed for the design process is in place before Stage 2. This includes ensuring that the brief can be accommodated on the site. A measured survey will be carried out at this stage if it is required. We will have weekly meeting, ideally on the same time and day, so we can keep a good pace on the design. We will have weekly meetings, ideally on the same day and at the same time each week, so we can keep the design process moving at a good pace. It’s best if possible to meet on the site so we can all understand the design spatially. I will also use 3d drawings to help you understand designs. Some clients find it hard to understand the designs at this stage, so I utilize these methods to help you and me!
RIBA STAGE 2: CONCEPT DESIGN
Stage 2 is about getting the design concept right and making sure that the look and feel of the building is proceeding in line with the client’s vison, brief and budget. The key challenge of this stage is to make sure that the tasks that are undertaken are geared to meeting the stage objectives. Going into too much detail too early can pivot the design team’s effort away from setting the best strategy for the project; but if there is too little detail, Stage 3 becomes inefficient.
RIBA STAGE 3: SPATIAL COORDINATION
RIBA STAGE 4: TECHNICAL DESIGN
STAGE 5: MANUFACTURING AND CONSTRUCTION
STAGE 6: HANDOVER
Stage 6 starts with the building being handed over to the client, with after-care initiated and the Building Contract concluded.
After the building has been handed over, the construction team rectify any residual defects as promptly as possible. Usually 6 -12 months after Practical Completion, the Final Certificate will be issued, which concludes the contractual involvement of the design and construction teams. Although Stage 6 commences after the building has been handed over, several tasks may need to commence during Stage 5 to ensure that the handover of the building is as efficient and effective as possible, such as training the users on how to use the Building Systems.
STAGE 7: USE
On the majority of projects, the design team and construction team will have no Stage 7 duties to undertake. However, both teams will be interested in receiving ongoing feedback, to help them understand how they might improve the performance of future buildings.
Post Occupancy Evaluation services are commissioned to determine how the building is performing in use to help fine tune the building and inform future projects.